Quote:
Originally Posted by irockidz28
just backfill with sand/gravel? kinda surprised its precast rather then poured in place
|
Usually they do what they call a drill shaft for the traffic intersections and bigger uprights. Its pretty much the same thing but just alot deeper. These are fairly light poles. Yes we backfill with dirt but before hand we hydro pack the base with a big fire hose and water tank. The drill shafts are more exspensive too then a precast base.
__________________
2000 SS Th350, FTI 4200 stall , cam, full bolt-ons, 150 wetshot, Moser 9inch/locker/4.11s, Slowhawk tuned. 493rwhp 570rwtq. 10.97 @ 127.7 1.58 60' and M6
10.84 @ 126.3 1.55 60' Th350 SOLD BUT NOT FORGOTTEN
New Toy - 06 Torrid Red Gto M6. 231/242 cam, Kooks, magnaflow, GForce, Monster stg2, lingenfelter cai, 411rwhp 385rwtq. 12.40@111
|