Work done so far:
Fixed high beam switch
Removed trim and lettering
Removed RS kit
Installed new clutch assembly/slave cylinder/flywheel
Added new floor mats
Installed front rotors
Installed new CD deck
Added exhaust tips
Installed polyurethane transmission mount
Replaced front bumper
Painted center console
Replaced coolant temperature sensor
Replaced drive shaft with one piece
Painted air intake
To do:
Spark plugs
Replace headliner
Replace tires
Upgrade suspension
Install rear calipers/rotors
Repair dents
Repaint silver