|
#1
|
||||
|
||||
|
Work done so far:
Fixed high beam switch Removed trim and lettering Removed RS kit Installed new clutch assembly/slave cylinder/flywheel Added new floor mats Installed front rotors Installed new CD deck Added exhaust tips Installed polyurethane transmission mount Replaced front bumper Painted center console Replaced coolant temperature sensor Replaced drive shaft with one piece Painted air intake To do: Spark plugs Replace headliner Replace tires Upgrade suspension Install rear calipers/rotors Repair dents Repaint silver
|
|
|