|
#1
|
||||
|
||||
|
I have to wait till probably mid summer for the workers in my town to fix the potholes in my street, and who knows how long for the state to fix the 495 fail-bridge into Haverhill, while the Japanese can pull shit like this off:
Japan fixed this quake-damaged road in just six days-gizmodo
__________________
![]() 95 Z28 hard top - LT1 | 4L60e | bolt ons | Yank SS3600 | suspension | viking coil overs | 3.42 10 bolt | 3520 lbs - 12.331 @ 108.22mph 1.668 60' 08 Saab 9-7x - L96 6.0 swap | L92 heads/intake/TB | LS6 cam | LS9 springs | 7.425" hardened pushrods | CAI | 1-3/4" stepped LT's | catback | 4L60E | FTI 3000 278mm converter |
|
|